View Quote

An arched bridge creates a changing level along the route between play towers. The installed example rises towards the centre, with timber balustrades following the bridge on each side.

A raised link between play towers

  • Timber bridge deck with a raised central section.
  • Balustrades along both sides of the crossing.
  • Connections between raised playground platforms.

The bridge can be considered as part of a connected adventure play layout, with its approach and landing positions coordinated with the towers.

Explore the wider range of playground accessories for connected adventure play structures.

    If you have any questions or would like a free quote, send us a message through the form below.

    You can also call us on 01453755161 or email sales@alloutplay.co.uk.