“…The area looks great. The children and staff are very excited…”
Site: Berrymede Primary School, London
Timings: 3 separate jobs, 4 weeks on site
Work & Equipment
- Outdoor Classrooms & Shelters – 4x2m outdoor classroom, two playground retreats
- Physical & Active – crawl tunnel, log bridge, stilt walk, balance beams
- Safety Surfacing – bonded rubber molch
- Sand and Water – multi level water play
- Panels & Sensory – activity panels, musical instruments
- Seating & Storage – storytelling chair and benches
- Performance, Nature / Eco – planters, pottery shed
- Landscaping and Decorative – ground preparation, iron railings and wooden fencing,
Cost: £57.9k inc install exc VAT