Berrymede Case Study

“…The area looks great. The children and staff are very excited…”

Site: Berrymede Primary School, London

Timings: 3 separate jobs, 4 weeks on site

Work & Equipment

  • Outdoor Classrooms & Shelters – 4x2m outdoor classroom, two playground retreats
  • Physical & Active – crawl tunnel, log bridge, stilt walk, balance beams
  • Safety Surfacing – bonded rubber molch
  • Sand and Water – multi level water play
  • Panels & Sensory – activity panels, musical instruments
  • Seating & Storage – storytelling chair and benches
  • Performance, Nature / Eco – planters, pottery shed
  • Landscaping and Decorative – ground preparation,  iron railings and wooden fencing,

Cost: £57.9k inc install exc VAT